Managing Change Orders on Fix and Flip Projects

By Infinity Lending ServicesUpdated March 4, 20266 min read

Quick Answer

Change orders modify the original scope of work during renovation. They can increase costs and delay timelines. Communicate changes to your lender promptly and document everything in writing.

What Are Change Orders?

A change order is a formal modification to the original scope of work during a renovation project. Change orders can add new work, remove planned work, or modify existing tasks.

In fix and flip projects, change orders are common because distressed properties often reveal hidden issues once renovation begins.

Common Reasons for Change Orders

Hidden Damage

Once walls are opened up, you may discover:

  • Termite or water damage
  • Faulty wiring or outdated electrical
  • Plumbing leaks behind walls
  • Foundation issues not visible during initial inspection
  • Mold or asbestos requiring remediation

Code Compliance

Older properties may need upgrades to meet current building codes:

  • Electrical panel upgrades
  • Smoke and carbon monoxide detectors
  • Egress window requirements
  • Handrail and stairway updates

Design Changes

Sometimes the planned renovation needs adjustment:

  • Material substitutions due to availability
  • Layout changes based on market feedback
  • Upgrades to improve ARV
  • Downgrades to control costs

How to Handle Change Orders

1. Document Everything

Every change order should be in writing and include:

  • Description of the change
  • Reason for the change
  • Cost impact (increase or decrease)
  • Timeline impact
  • Signatures from both investor and contractor

2. Notify Your Lender

Contact your lender as soon as a significant change order arises. They need to know if:

  • The total rehab budget is increasing
  • The scope of work is changing materially
  • The project timeline is extending
  • The ARV estimate is affected

3. Evaluate the Impact

Before approving a change order, consider:

  • Does this change improve the ARV?
  • Is the additional cost justified by the return?
  • How does it affect the project timeline?
  • Is there enough contingency budget to cover it?

Preventing Unnecessary Change Orders

  • Thorough inspections before purchasing the property
  • Detailed scope of work that accounts for likely issues
  • Experienced contractors who identify problems early
  • Adequate contingency budget (10-15% of rehab costs)
  • Regular site visits to catch issues before they escalate

Key Takeaways

  • ✓Document all change orders in writing with costs
  • ✓Communicate changes to your lender immediately
  • ✓A contingency budget helps absorb unexpected changes
  • ✓Thorough inspections before closing reduce surprises

Frequently Asked Questions

About the Author

Written by the nuFLIP lending team — America's Residential Transition Loan (RTL) Experts. nuFLIP helps real estate investors finance Fix & Flip, Bridge, Ground-Up Construction, and DSCR rental loans with fast underwriting, ARV-based loan sizing, rehab funding, and institutional capital solutions.

Ready to Finance Your Next Deal?

Get instant, transparent loan quotes with exact rates and terms. No surprises, no obligation.

Related Articles

Project Budgeting

Contractor Bids That Get Approved by Lenders

Learn how to prepare contractor bids and scope of work documents that meet lender requirements for fix and flip loan approval.

Project Budgeting

Construction Draw Schedules Explained for Fix and Flip Projects

Learn how construction draw schedules work for fix and flip projects, including typical draw stages and inspection requirements.

Project Budgeting

Scope of Work Template for Fix and Flip Projects

Use this scope of work template to organize your fix and flip renovation plan, satisfy lender requirements, and manage contractor expectations.