Construction Draw Schedules Explained for Fix and Flip Projects

By Infinity Lending ServicesUpdated March 4, 20266 min read

Quick Answer

Rehab funds are released after inspections verifying work completion. Typical draw stages include demolition, rough construction, mechanical, finish work, and final completion.

How Draw Schedules Work

In fix and flip lending, rehab funds are not given to the borrower upfront. Instead, they are held in a reserve account and released in stages as work is completed and verified through inspections.

This process protects the lender by ensuring funds are only released for work that has actually been done.

Typical Draw Stages

1. Demolition

The first draw covers demolition and site preparation. This includes removing old fixtures, tearing out walls, and clearing the property for renovation.

2. Rough Construction

Framing, structural repairs, and major construction work. This is often the largest single draw.

3. Mechanical Systems

Electrical, plumbing, and HVAC rough-in work. These systems must be installed before walls are closed up.

4. Finish Work

Drywall, flooring, cabinetry, painting, and interior finishes. This stage transforms the property into a livable space.

5. Final Completion

Final touches including landscaping, exterior work, cleaning, and punch list items. The property should be market-ready after this stage.

The Draw Request Process

  1. Complete a phase of work according to your scope of work
  2. Submit a draw request to your lender with documentation
  3. Lender schedules an inspection
  4. Inspector verifies work completion and quality
  5. Lender approves the draw
  6. Funds are disbursed to the borrower

Tips for Smooth Draw Processing

  • Keep detailed records of all work completed with photos
  • Follow your scope of work exactly as submitted to the lender
  • Submit draw requests promptly after completing each phase
  • Budget for out-of-pocket costs between draws
  • Communicate with your lender if timelines change

Key Takeaways

  • ✓Rehab funds are released in stages, not upfront
  • ✓Each draw requires an inspection to verify work completion
  • ✓A detailed scope of work is essential for smooth draw processing
  • ✓Plan your cash flow around the draw schedule

Frequently Asked Questions

About the Author

Written by the nuFLIP lending team — America's Residential Transition Loan (RTL) Experts. nuFLIP helps real estate investors finance Fix & Flip, Bridge, Ground-Up Construction, and DSCR rental loans with fast underwriting, ARV-based loan sizing, rehab funding, and institutional capital solutions.

Ready to Finance Your Next Deal?

Get instant, transparent loan quotes with exact rates and terms. No surprises, no obligation.

Related Articles

Project Budgeting

Managing Change Orders on Fix and Flip Projects

Learn how to handle change orders during a flip renovation, communicate with your lender, and protect your budget from scope creep.

Project Budgeting

Contractor Bids That Get Approved by Lenders

Learn how to prepare contractor bids and scope of work documents that meet lender requirements for fix and flip loan approval.

Project Budgeting

Scope of Work Template for Fix and Flip Projects

Use this scope of work template to organize your fix and flip renovation plan, satisfy lender requirements, and manage contractor expectations.