Managing Change Orders on Construction Projects

By Infinity Lending ServicesUpdated March 4, 20266 min read

Quick Answer

Change orders on construction projects modify the original scope, budget, or timeline. Every change order should be documented in writing, priced before approval, and communicated to your lender. Unmanaged change orders are a leading cause of budget overruns.

Types of Change Orders

Owner-Initiated Changes

Changes requested by the property owner or builder:

  • Material upgrades or downgrades
  • Layout modifications
  • Additional features or scope
  • Design corrections

Field-Initiated Changes

Changes required due to conditions discovered during construction:

  • Unexpected soil or site conditions
  • Utility conflicts
  • Code compliance issues
  • Structural modifications required by inspectors

Design-Initiated Changes

Changes resulting from errors or omissions in the original plans:

  • Missing details in architectural drawings
  • Engineering modifications
  • Coordination conflicts between trades
  • Specification clarifications

Change Order Process

Step 1: Identify the Change

Describe the proposed change in detail, including:

  • What is being changed
  • Why the change is needed
  • Impact on the project timeline

Step 2: Price the Change

Before approving any change, get a written price that includes:

  • Material costs
  • Labor costs
  • Markup or overhead
  • Impact on other trades
  • Net cost increase or decrease

Step 3: Approve in Writing

Both the builder/owner and the contractor must sign the change order before work begins. The document should include:

  • Description of the change
  • Cost impact
  • Timeline impact
  • Signatures and date

Step 4: Notify the Lender

Significant change orders should be communicated to your lender:

  • Changes that increase the total budget
  • Changes that affect the completed value
  • Changes that extend the construction timeline

Step 5: Update the Budget

Adjust your schedule of values and cost-to-complete analysis to reflect the change order.

Controlling Change Orders

  • Detailed plans: Thorough plans and specifications reduce field-initiated changes
  • Pre-construction review: Have all trades review plans before construction begins
  • Decision deadlines: Make material and design selections early
  • Change order log: Track all changes with running cost totals
  • Contingency allocation: Apply change order costs against contingency first
  • Weekly meetings: Regular progress meetings catch issues before they become change orders

Key Takeaways

  • ✓Document every change order in writing before work begins
  • ✓Get pricing before approving any change
  • ✓Communicate significant changes to your lender promptly
  • ✓Track change order costs against your contingency budget

Frequently Asked Questions

About the Author

Written by the nuFLIP lending team — America's Residential Transition Loan (RTL) Experts. nuFLIP helps real estate investors finance Fix & Flip, Bridge, Ground-Up Construction, and DSCR rental loans with fast underwriting, ARV-based loan sizing, rehab funding, and institutional capital solutions.

Ready to Finance Your Next Deal?

Get instant, transparent loan quotes with exact rates and terms. No surprises, no obligation.

Related Articles

Construction Financing

Construction Contingency Budget: How Much Is Enough?

Learn how to set the right contingency budget for your construction project and what expenses it should cover.

Construction Financing

Preventing Construction Cost Overruns

Learn the most common causes of construction cost overruns and proven strategies to keep your building project on budget.

Construction Financing

Schedule of Values for Construction Loans

Learn how a schedule of values works in construction lending, how draws are structured, and how to create one that satisfies lender requirements.